Controversial £2.4 million cycle street could be torn up after trial period, admits head of organisation that built it

3 weeks ago 1
Brian Milnes, the chairman of the Greater Cambridge Partnership (GCP) which installed the bright red, third-of-a-mile-long scheme, revealed its future depended on a trial period.

Source: https://www.dailymail.com/news/article-15855403/Controversial-2-4-million-cycle-street-torn-trial-period-admits-head-organisation-built-it.html?ns_mchannel=rss&ito=1490&ns_campaign=1490

Read Entire Article

Disclaimer of liability !!!

NEWS.SP1.RO is an automatic news aggregator. In each article, taken over by NEWS.SP1.RO with maximum 500 characters from the original article, the source name and hyperlink to the source are specified.

The acquisition of information aims to promote and facilitate access to information, in compliance with intellectual property rights, in accordance with the terms and conditions of the source.

If you are the owner of the content and do not wish to publish your materials, please contact us by email at [email protected] and the content will be deleted as soon as possible.