Czech Dam Project Was Stalled by Bureaucracy. Beavers Built Their Own.

10 months ago 9
The dam project, drafted in 2018 and based on a former military training site south of Prague, had been delayed by land negotiations. Local beavers built several dams, saving the government more than one million euros.

Source: https://www.nytimes.com/2025/02/12/world/europe/czech-dam-project-was-stalled-by-bureaucracy-beavers-built-their-own.html

Read Entire Article

Disclaimer of liability !!!

NEWS.SP1.RO is an automatic news aggregator. In each article, taken over by NEWS.SP1.RO with maximum 500 characters from the original article, the source name and hyperlink to the source are specified.

The acquisition of information aims to promote and facilitate access to information, in compliance with intellectual property rights, in accordance with the terms and conditions of the source.

If you are the owner of the content and do not wish to publish your materials, please contact us by email at [email protected] and the content will be deleted as soon as possible.