Labour told to 'get on with it' as coal shipment needed to save Scunthorpe's furnaces still stuck on ship in dock 24 hours after Government took control of British Steel
Source: https://www.dailymail.co.uk/news/article-14605439/Labour-coal-shipment-needed-save-Scunthorpe-furnaces-stuck-ship-dock-24-hours-Government-British-Steel.html?ns_mchannel=rss&ito=1490&ns_campaign=1490
Disclaimer of liability !!!
NEWS.SP1.RO is an automatic news aggregator. In each article, taken over by NEWS.SP1.RO with maximum 500 characters from the original article, the source name and hyperlink to the source are specified.
The acquisition of information aims to promote and facilitate access to information, in compliance with intellectual property rights, in accordance with the terms and conditions of the source.
If you are the owner of the content and do not wish to publish your materials, please contact us by email at [email protected] and the content will be deleted as soon as possible.

6 months ago
7






English (US) ·