Obama library, begun with lofty DEI goals, now plagued by $40M racially charged suit, ballooning costs
8 months ago
7
Construction of former President Barack Obama's long-awaited library and museum in Chicago began with ambitious plans for diversity, equity and inclusion (DEI) but is now plagued by huge cost overruns, delays and a $40.75-million, racially charged lawsuit filed by a minority contractor.
From the outset, the endeavor touted DEI as a key part of enshrining Obama's legacy at the 19.3-acre site, where costs have ballooned from an initial $350 million to $830 million in 2021 based on its pre...
NEWS.SP1.RO is an automatic news aggregator. In each article, taken over by NEWS.SP1.RO with maximum 500 characters from the original article, the source name and hyperlink to the source are specified.
The acquisition of information aims to promote and facilitate access to information, in compliance with intellectual property rights, in accordance with the terms and conditions of the source.
If you are the owner of the content and do not wish to publish your materials, please contact us by email at [email protected] and the content will be deleted as soon as possible.